Yosemite Big Meadow Wilfire, 8.27.09Yosemite Big Meadow Wildfire 8.26.09tenaya lake 4.29.12Glacier Point Hut 3/22/08Deer grazing in Tuolumne Meadows, Yosemiteforesta-yosemite-2-19-11Indian Paintbrush, Tuolulmne MeadowsBadger Pass 3/28/11March 20>25 2011 StormsBadger Pass 3/28/11
Home

Hwy 120 Road Repair

Hwy 120 Road Repair 2/29/12 to 4/1/12

Hwy 120 on 2/18/12

These photos show the section of Hwy 120 that will be reuilt. The road will be closed on 2/29/12 till some time aound 4/1/12

This section of the road will be totally rebuilt.

I measured the section that needs to be rebuilt at it is only 45' long.

Highway 120 2/18/12
Highway 120 2/18/12
Highway 120 2/18/12
Highway 120 2/18/12
Highway 120 2/18/12
Highway 120 2/18/12
Highway 120 2/18/12
Highway 120 2/18/12
Highway 120 2/18/12
Highway 120 2/18/12
Highway 120 2/18/12
Highway 120 2/18/12
Highway 120 2/18/12
Highway 120 2/18/12
hwy-120-2-3-4-12
hwy-120-3-4-12

Photos of the section of Hwy 120 just up from the junction of Hwy 120 and Hwy 140. This section was taken out by a rockfall and is now going to be repaired 2/29/12 to 4/1/12. The road will be closed for a month. Yosemite National Park announces that the Big Oak Flat Road (Highway 120) within the park will close at 8:00 a.m. on Wednesday, February 29, 2012, for the park to repair damage to the road caused by a large rockslide on January 22, 2012. The closure, in effect 24 hours per day, seven days per week, is expected to last until early April. Crews will be working around the clock which necessitates a “hard-closure.” The road will be closed between the Foresta Road Junction on the Big Oak Flat Road (Highway 120) and the El Portal Road (Highway 140) junction. Yosemite Valley remains accessible via El Portal Road (Highway 140) coming from Merced/ Mariposa and via Wawona Road (Highway 41) coming from Fresno/ Oakhurst. The Foresta Road, between Foresta and El Portal, is not accessible.

Source: Flickr